Location: Port Deposit, Maryland
Engineering Firm: CNA, Forest Hill, Maryland
Scope of Project: Part A
Installation of new aeration system for two 40,000 storage tanks. Infra
Tech, LLC fabricated over 90 ft of 3" stainless steel pipe with welded threadolets to mount 36 diffusers. Removed a section of the existing 4"
aeration line and replaced with stainless steel ball valves for new
aeration lines to both tanks. Removed old and installed two new blowers.
Scope of Project: Part B
10' diam. x 30ft deep concrete duplex pump station with internal check
and plug valves and Ebara 3HP grinder pumps. El-Tex control panel with
Bihler Tech bubbler system.
In addition to the wet well, Infra Tech fabricated a 5' x 5' x 6' tall
platform made of 3/8 steel with railing to support the above ground
piping and static bar screen.
|